Know about the work before it goes to bid.

EARL (Early Agenda, Regional Leads) reads more than 50 public sources across the Columbia Basin every week and tells you about construction work at its first public step, often months before a permit or a bid.

EARL · Columbia Basin · week of Oct 26, 2026
  • Early noticeMartin Airfield grading and fill project, College PlaceEnvironmental review notice · before any permit
  • Early noticeQuail Ridge phases 6 to 9, 229 lots, RichlandPre-application meeting · planning stage
  • Site workLatitude Apartments site development, College Place$4,227,962 · permit application
  • ForecastHanford WARM site preparation$5M to $10M · posting expected
  • Open bidCounty Route 12 path repairs, Benton CountyBids due Nov 19
50+
Public sources
read every week
50+
Public sources read every week
29,000+
Pages of agency documents read so far
17,000+
Project records for the eight counties
240+
Early-stage filings in the last 90 days

A project is public record long before it is a bid.

Most lead services start at the permit or the bid. By then the design team is picked and the bid list is filling. EARL starts at the first public filing.

  1. Stage 1 · EARL starts here

    Proposed

    A pre-application meeting, an environmental review notice or a land-use application is filed. The project has a name, a place and a size, and almost nobody is watching.

  2. Stage 2

    Reviewed

    It appears on planning agendas: hearings, plats, site plans, conditional uses and rezones. Public agencies approve design contracts and capital budgets that name the job.

  3. Stage 3

    Permitted

    Grading, site development and building permits are applied for and issued, with a declared value and often the contractor.

  4. Stage 4

    Bid and awarded

    Public work is advertised, bids are opened, and the award names the winner and the amount. Everyone can see it now.

EARL reports all four stages, and puts the first two up front. The earlier you know, the more you can do about it: call the owner, get on the bid list, price the dirt work, hold equipment, plan crews.

How we get the information.

Everything in EARL comes from records that public agencies publish themselves. We go to the source, every week, and read all of it so you don't have to check dozens of agency websites by hand.

The Columbia Basin edition draws on more than 50 sources of six kinds: city and county permit records, planning and land-use agendas, state environmental review notices, construction stormwater coverage, public bid boards and contract awards, and state and federal energy and procurement filings.

Where an agency publishes no permit list at all, we ask for it with a public records request, and keep asking each month.

Read at the source

Permit reports, agenda packets and notices are collected from the agency that issued them, and meeting packets are read page by page, not just the agenda titles.

Every week, on schedule

Collection runs automatically on our own hardware, and every run is logged and checked. A source that goes quiet raises a flag the same day.

Sorted and cross-linked

Each record is sorted by kind of work and size, then matched by parcel, address and location, so one project's filings line up across agencies.

Checked before it is sent

Duplicates are merged, superseded notices are dropped, and known errors in an agency's data are corrected before the issue goes out.

One email a week, earliest work first.

Organized by stage and kind of work, with the value where the record gives one. Every line links to the public record it came from.

  • Early notice

    Environmental and land-use filings

    Environmental review notices, pre-application meetings, plats, site plans and rezones: projects at the proposal stage.

  • Early notice

    Planning agendas

    What cities, counties, ports and utility districts are about to decide: hearings, design contracts, authorizations to bid, and budgets that name projects.

  • Early notice

    Watch list

    Moratoria, zoning changes and public debate about data centers, industrial sites and housing: where work may be coming, or held up.

  • Permits

    New projects

    Commercial, multifamily, site work and demolition permits, with the declared value and the contractor when the record names one.

  • Public work

    Bids and awards

    Open bids with due dates, contract awards with the winner and amount, and federal market-research notices.

  • Forecast

    Hanford and energy

    Hanford procurement forecasts, state energy-siting filings and federal power-system reviews in the region.

Public records, handled with care.

EARL reports what the record says and shows you where to check it. These rules don't bend.

Every line links to its record

Nothing is paraphrased from memory or passed along second hand. Each item carries a link to the agency's own document, so you can read it yourself before you act.

The businesses behind each project

When a record names the owner, applicant or contractor business, EARL shows it, along with the agency handling the file, so you know who to call.

What is known, and no more

A value appears only when the record states one, and a stage is reported as the stage it is. Early notice is not a promise that a project will be built.

For the people who do the work.

The same week's records mean different things depending on what you sell. Early notice helps each trade in its own way.

  • General contractors

    See projects at the proposal and plat stage, and start the conversation with the owner before the bid list fills.

  • Subcontractors and trades

    Know what is coming near you, and who won the job once it is awarded.

  • Equipment rental

    Grading, site work and large builds, with the notices that tell you when ground is likely to move.

  • Suppliers and engineers

    Volume headed to your area weeks ahead, and land-use filings and design contracts as they are approved.

Coverage: the Columbia Basin.

The first edition covers eight counties in two states, plus the Hanford Site. It goes out once a week.

More of Washington is in preparation. Tell us where you work when you ask for a sample.

Washington

Benton, Franklin, Yakima, Grant, Adams and Walla Walla counties

Oregon

Umatilla and Morrow counties

Hanford Site

Procurement forecasts and contract awards

Schedule

One issue each week, by email

See a recent issue for yourself.

We'll email you a recent Columbia Basin issue, free, so you can judge it against the work you already know about.

Your details are used to send the sample and to follow up about EARL. They are never sold or shared.